Start free sample
Coverage Applications & filings States Trades Permit lookup Blog Compare Pricing Start free sample
PermitBoards — daily permit alerts by county and trade. Start the paid plan — $29/mo Free 14-day sample

Home › Blog › Washington permit applications: what's in the pipeline — November 2026

Washington permit applications: what's in the pipeline — November 2026

Start a free 14-day sample feed for your county

Washington, DC currently has 44 building-permit applications that are filed but not yet issued, counted over the filings window Oct 15, 2026 to Nov 13, 2026 from the city's own published application records. The largest single group, 27 filings, sits at 'Corrections or more information requested'.

The pipeline by stage

StageApplicationsShareNewest filing at this stage
In review / plan check1534%5xxx Name not published, WASHINGTON, DC 20032 (Nov 13, 2026)
Corrections or more information requested2761%3xxx CONNECTICUT AVE NW, WASHINGTON, DC 20008 (Nov 13, 2026)
Approved, awaiting issue25%6xx I ST NW, WASHINGTON, DC 20001 (Nov 13, 2026)

Washington's pipeline bunches at corrections: 27 filings (61% of the 44) have been sent back to the applicant for fixes or missing information. A corrections pile this size is a timing signal of its own — every one of those jobs is stalled mid-review, and stalled jobs are where owners reconsider architects, expediters and sometimes builders. 2 filings (5%) have cleared review and are approved, awaiting issue. The filings still moving cleanly are the 15 in review.

How Washington's pipeline is moving

Week by week inside the window, filings ran x in the first stretch, then x, x, and 44 in the most recent days.

The trade mix in Washington's pipeline

TradeApplicationsShare
Other / general3170%
Demolition & dumpster1125%
Remodel & addition37%
Plumbing25%
HVAC12%

Demolition & dumpster is the largest classified trade in the pipeline with 11 filings (25% of all 44). Within that lane, the filings bunch at 'In review / plan check': 10 of the 11 are there, so demolition & dumpster crews watching Washington are mostly looking at city reviewers are checking the plans against code. The next lane is remodel & addition with 3 filings.

Who is filing in Washington right now

Applicant (as published)Filings in the pipeline
Name not published1
Name not published1
Name not published1

The filings cluster in ZIP codes 20009 (7), 20001 (5), 20032 (5) — the rest spread across 17 ZIP codes in the published addresses.

Newest filings on the board

  • 6xx I ST NW, WASHINGTON, DC 20001 — In the Downtown Historic District In Chinatown New Mixed Used Retail and Apartment project consisting of 2 new 8 stor... (Approved, awaiting issue; Nov 13, 2026)
  • 8xx ROCK CREEK CHURCH RD NW, WASHINGTON, DC 20010 — POST CARD (Approved, awaiting issue; Nov 13, 2026)
  • 5xxx Name not published, WASHINGTON, DC 20032 — Demolition of non-structural partitions, finishes, fixtures and equipment to prepare for building alteration. (Buildi... (In review / plan check; Nov 13, 2026)
  • 2xxx CHAIN BRIDGE RD NW, WASHINGTON, DC 20016 — Interior demolition on all levels to remove existing partitions, finishes, fixtures, appliances and associated appurt... (In review / plan check; Nov 13, 2026)
  • 4xxx 3RD ST NW, WASHINGTON, DC 20011 — Interior demolition only. Remove existing wood wall paneling, non-load-bearing partition walls, built-in bar/counter,... (In review / plan check; Nov 13, 2026)
  • 5xx 5TH ST SE, WASHINGTON, DC 20003 — Historic demo existing basement slab (In review / plan check; Nov 13, 2026)

Subscribers in Washington, DC see new filings every morning with their stage, next to the issued permits for their trade — applications are included in the same county + trade seat, never a separate charge. For Washington, DC right now that means watching 44 live filings, 27 of them at 'Corrections or more information requested'. The market's full picture is on the Washington, DC coverage page and the applications hub.

Frequently asked questions

How many unissued permit applications does Washington, DC have?
44 applications were filed but not yet issued in the latest filings window (Oct 15, 2026 to Nov 13, 2026).

Which stage holds the most Washington applications?
'Corrections or more information requested' — 27 of the 44 filings (61%), meaning the city sent the application back for fixes or missing information.

What trades are filing the most applications in Washington?
Demolition & dumpster leads the classified trades with 11 filings, followed by remodel & addition (3) and plumbing (2).

Who is filing the most applications in Washington?
Name not published — 1 filings in the current pipeline window, counted from the names Washington, DC publishes on the filings themselves.

Does Washington publish applicant [name] on applications?
x% of the 44 filings in this window carry a phone number as published on the record (x of them). PermitBoards passes published fields through exactly as released and never appends bought contact data.

Check the actual permits before you pay — free lookup

Search 85,801 issued permits across 31 live markets by ZIP code or city: real addresses, job descriptions and published job values from the same live feed subscribers get every morning. No signup, no card.

Run a free permit lookup See a sample daily alert

Get permits like these for your trade, every morning

Start the paid plan when you're ready — $29 a month for one county — every trade in it — month-to-month, no sales call. Or start with a free 14-day sample feed: the real daily email, built from live permit records. If it doesn't show you work worth chasing, don't pay for it.

Start the paid plan — $29/mo Free 14-day sample See a sample alert first