Start free sample
Coverage Applications & filings States Trades Permit lookup Blog Compare Pricing Start free sample
PermitBoards — daily permit alerts by county and trade. Start the paid plan — $29/mo Free 14-day sample

Home › Blog › How to read Washington's building permit records

How to read Washington's building permit records

Start a free 14-day sample feed for your county

Two clocks run in Washington, DC's feed: applications moving through review, and issued permits landing behind them — 4,127 issued records in our database so far. This guide documents the feed field by field: the most common record is a 'SUPPLEMENTAL' permit (2,132 of them) and x% of records publish a job value, all of it measured on the records themselves.

Which fields the feed publishes

FieldCoverage on issued permits
Job valuex% of records (x of 4,127)
Contractor name50% of records (2,058 of 4,127)
Contractor phonex% of records (x of 4,127)
Contractor emailx% of records (x of 4,127)
Work description44% of records (1,824 of 4,127)
Street address100% of records (4,127 of 4,127)

Job values: never appear — Washington, DC publishes no value field across its 4,127 issued records, so no record carries one and nothing here is estimated. Contractor phones: are published on none of the 4,127 issued records — the feed names a contractor on 50% of records but releases no phone for any of them. Work descriptions: appear on 44% of records and carry the real scope language contractors search by. All of those percentages are this market's own — measured on its 4,127 issued records only. Anything the feed withholds is labeled "not published" rather than patched over with estimates or purchased data.

One real record, field by field

For a concrete example, the most recent issued record sits at 4xx 20TH ST NE, WASHINGTON, DC 20002, filed as a POST CARD permit, issued Nov 15, 2026, naming Name not published as contractor.

What Washington actually permits

Permit type (as published)Issued records
SUPPLEMENTAL2,132
CONSTRUCTION1,275
POST CARD484
Name not published209
SHOP DRAWING27

The feed's rhythm: issued permits by month

MonthIssued permits in our records
Oct 20262,622
Nov 20261,505

Where the records concentrate

ZIP codeIssued permits in our records
20002454
20011431
20001307
20007278
20020251

The feed by trade lane

Trade laneIssued recordsShare
Plumbing40710%
Remodel & addition2917%
Demolition & dumpster1103%
Solar682%
Roofing672%

The character of this feed

Washington, DC publishes both sides of the permit clock: 4,127 issued records in our database and 44 filings currently somewhere in review — x filed, 15 in review, 27 in corrections, 2 approved and waiting. A feed with a live pipeline reads weeks earlier than an issued-only feed. The pipeline's center of gravity is the 'corrections_or_info' stage, holding 61% of open filings.

Who files here: the names on the most records

Filer (as published)Issued permits in our recordsShare of feed
Name not published491%
Name not published341%
Name not published301%
Name not published281%
Name not published261%
Name not published241%

Name not published sits at the top with 49 issued permits — 1% of everything Washington, DC has issued in our records. The names rotate — the top of the table holds 1%, and the five names under it split most of the rest: a feed with no gatekeeper.

The most recent records, as published

IssuedAddressPermit type (as published)Contractor (as published)
Nov 15, 20264xx 20TH ST NE, WASHINGTON, DC 20002POST CARDName not published
Nov 15, 20264xxx BLAGDEN AVE NW, WASHINGTON, DC 20011POST CARDName not published
Nov 15, 20261xxx LOCUST RD NW, WASHINGTON, DC 20012SUPPLEMENTALContractor not published
Nov 15, 20261xxx Q ST NW 31, WASHINGTON, DC 20009SUPPLEMENTALContractor not published
Nov 15, 20261xxx 5TH ST NW, WASHINGTON, DC 20001SUPPLEMENTALContractor not published

Washington, DC does not publish job values on these records, so this guide ranks by recency instead — the newest record above is the freshest thing the feed has released.

How this feed moves

Issuance has eased: 1,505 permits in November 2026 against 2,622 in October 2026.

The field that sets this feed apart

One field sets Washington, DC apart, by absence: Job values appear on only x% of its issued records, against a 100% median across the 31 markets we track — and it is the field that lets a reader rank jobs by size instead of just counting them.

Spotlight: the 'SUPPLEMENTAL' record

'SUPPLEMENTAL' is the single most common published type in Washington, DC — 2,132 records, 52% of the feed. Within that one type, its most active filer is Name not published with 49 permits; its newest example issued Nov 15, 2026 at 1xxx LOCUST RD NW, WASHINGTON, DC 20012.

The streets the records name most

Street (as published)Issued permits in our records
Pennsylvania66
14Th66
8Th62
13Th59
M59
15Th52

Pennsylvania leads with 66 issued permits — 2% of every addressed record in the feed. Street concentration like this is the shape of the work itself: corridors, not scatter.

The feed's own vocabulary

Word in published work descriptionsRecords
existing709
trade429
plumbing410
interior347
historic316
electrical311
floor280
replace256

Counted from the scope text itself: 'existing' is the single most repeated word in Washington, DC's descriptions, appearing in 709 records. Read together, the eight words above are the market's workload in miniature.

Timing: the two signals in one feed

Timing is the second signal in this feed. 3,911 of the 4,127 issued records (95%) landed in the latest 30-day window alone, Oct 11, 2026 to Nov 9, 2026 — cleared work whose contractor is usually already chosen. This market also publishes applications: 44 filings are in the pipeline unissued, the earlier signal general contractors work. The database's issued history for Washington, DC runs: 4,127 in 2026. 1% of all its records (44 of them) carry a filing date as well as an issue date.

The full market picture — 3,911 permits in the current window, 4,127 issued records in all — is refreshed daily on the Washington, DC coverage page; the free permit lookup searches those same 4,127 records.

Frequently asked questions

Does Washington publish contractor phone numbers on permits?
x% of Washington, DC's issued permits in our database carry a contractor phone as published on the record, and x% carry an applicant phone. PermitBoards passes published fields through and never appends bought data.

How current are Washington's permit records here?
In our database, Washington, DC's current window holds 3,911 issued permits (Oct 11, 2026 to Nov 9, 2026); its newest record is dated Nov 9, 2026, and 4,127 issued records back it up. PermitBoards refreshes its feeds daily and prints each market's own dates rather than smoothing over feed lag.

How many permits does Washington issue in 30 days?
3,911 permits in the latest 30-day window, counted from the city's own published records — 95% of all 4,127 issued records in the database.

What permit types does Washington publish most?
The most common published type is 'SUPPLEMENTAL' with 2,132 issued records in our database, followed by 'CONSTRUCTION' (1,275) and 'POST CARD' (484).

Who files the most permits in Washington?
Name not published — 49 issued permits in our database, 1% of Washington, DC's whole issued record, counted from the names the feed itself publishes.

Check the actual permits before you pay — free lookup

Search 85,801 issued permits across 31 live markets by ZIP code or city: real addresses, job descriptions and published job values from the same live feed subscribers get every morning. No signup, no card.

Run a free permit lookup See a sample daily alert

Get permits like these for your trade, every morning

Start the paid plan when you're ready — $29 a month for one county — every trade in it — month-to-month, no sales call. Or start with a free 14-day sample feed: the real daily email, built from live permit records. If it doesn't show you work worth chasing, don't pay for it.

Start the paid plan — $29/mo Free 14-day sample See a sample alert first