US permit types, decoded for international investors
Start a free 14-day sample feed for your county
US permit records sort into trade lanes, and each lane has its own economics. PermitBoards classifies every record it tracks — 85,801 issued permits across 31 markets — into the lanes below, so an investor reading from abroad sees the same structure a local operator sees.
New construction
Whole buildings: houses, commercial structures, development phases. The largest values, the longest review cycles, and the deepest application pipelines. One filing can mean a year of work for a dozen trades, which is why this lane leads the biggest-projects lists on this blog.
Remodel & addition
Kitchens, baths, additions, conversions — where Name not published and small-investor money shows up first, and the broadest lane by count in most feeds. It is the most competitive lane for general contractors and the fastest-moving.
The trade lanes
Roofing permits mark re-roofs and structural repairs — weather- and insurance-driven, and quick to convert. Electrical, plumbing, and HVAC permits cover both standalone work and the trade scope inside bigger projects, so their volume gauges total construction activity. Solar permits name the installer and move through review fastest. Pool permits are among the highest-value residential records and pull fencing, decking, and landscaping behind them. Demolition permits are the change signal: something is coming down, and usually something follows.
Reading a market through its lanes
Rising remodel counts with flat new construction describes a mature, homeowner-driven market. Rising demolition followed by new construction describes a corridor being rebuilt. The lane mix is the market's fingerprint, and it is visible in the free permit lookup before any purchase.
Frequently asked questions
Which US permit type carries the largest projects?
New construction, by a wide margin — whole houses, buildings, and development phases, with published values from six figures into the tens of millions. Remodel and addition work is the broadest lane by count in most markets.
What does a demolition permit predict?
Change. A demolition filing means a structure is coming down, and on most parcels something is going up after it. Demo permits precede new-construction filings on the same site, often by months — the earliest land signal in the record.
Do permit records show project values?
Where the jurisdiction publishes them, yes — the declared job value from the application itself. PermitBoards prints values exactly as published and never estimates them.