Start free sample
Coverage Applications & filings States Trades Permit lookup Blog Compare Pricing Start free sample
PermitBoards — Daily permit alerts by county and trade. Free 14-day sample Start the paid plan — $29/mo

Home › Blog › The Birmingham Permit Index — week of Monday, November 23, 2026

The Birmingham Permit Index — week of Monday, November 23, 2026

Start a free 14-day sample feed for your county

Birmingham, AL filed 83 building permits dated Nov 18, 2026 to Nov 23, 2026 — every roof, remodel, panel upgrade, and new build in the register for those 4 dated days, with the address and what the job is. Almost nobody reads them. The Permit Index does: this post is built entirely from those 83 permits in our database for Birmingham, AL, pulled from the jurisdiction's own published records. No estimates, no padding — if a number is here, it is counted from those records. The busiest lane was electrical.

How this market is dated: Birmingham, AL publishes filing dates, not issue dates, on its permit register, so this index counts its issued-stage records by the date each one was filed. The counts are the same records the coverage and trade pages enumerate — only the date basis differs, and it is never blended with issued-date markets.

The week in numbers

Birmingham, AL filed 83 permits in this window. The busiest lane was electrical. The feed's own status and latest dates are on the Birmingham, AL coverage page.

Trade lanePermits in window
Electrical34
Plumbing19
HVAC18
Other / general11
Roofing5
Demolition & dumpster3

What the records themselves show

Of the 83 permits counted here, 9 publish a job value, totaling $109,838 in published work. A contractor or applicant name is published on 83 of them (100%), and a work description on 83 (100%). The permit types that appear most are: Electrical Permit (20), Building Permit (16), Low Voltage Electrical (14). That mix is what a crew chief is really reading: the type and description say what the job is, the lane says whose work it is, and the published value — where the feed carries one — says how big it is. Records that publish no value are counted, never estimated.

Largest published job values

AddressFiledPublished value
1xxx S 10TH ST S, BHAM AL 35205Nov 18, 2026$60,376
1xxx S 10TH AVE S, BHAM AL 35294Nov 18, 2026$21,500
1xxx S 10TH ST S, BHAM AL 35205Nov 18, 2026$10,647
2xx SUMMIT BLVD, AL 35243Nov 18, 2026$10,000
1xxx S 21ST AVE S, BIRMINGHAM AL 35209Nov 23, 2026$3,600

Five of the newest permits

FiledAddressWorkPublished valueContractor on permit
Nov 23, 20261xxx WINOLA LN, BHAM AL 35235WINOLA REWIRE REWIRENot publishedNot listed
Nov 23, 20268xx S 42ND ST S, BHAM AL 35222JOHNSON REPLACE 3 TON FURNACENot publishedNot listed
Nov 23, 20261xxx S 21ST AVE S, BIRMINGHAM AL 35209GAS UPDATE RELOCATE SOME GAS FIXTURES$1,865Not listed
Nov 23, 20261xxx INDIANA ST, BIRMINGHAM AL 352241xxx Indiana Street/[permit #] [permit #] Install low voltage for ThermostatNot publishedNot listed
Nov 23, 20261xxx S 21ST AVE S, BIRMINGHAM AL 35209RELOCATE A/C RELOCATE / MOVE FURNANCE$3,600Not listed

Subscribers in Birmingham, AL got each of these in the morning digest for their trade — the full feed, daily, is on the Birmingham, AL page. Lane pages from this index: Birmingham electrical permits · Birmingham plumbing permits · Birmingham hvac permits. This market is new to the board, so its one-off report opens once a full 30 days of its records are held — the daily sample feed is the way in today.

This index in one line: 34 permits in electrical, 19 permits in plumbing, 18 permits in hvac — the largest published value is $60,376 at 1xxx S 10TH ST S, BHAM AL 35205

Frequently asked questions

How many building permits did Birmingham, AL filed this week?
83 permits, Nov 18, 2026 to Nov 23, 2026, counted from the jurisdiction's own published records. The busiest lane was electrical.

What is the biggest job permitted in Birmingham this week?
$60,376 at 1xxx S 10TH ST S, BHAM AL 35205 (CROWNE ON 10TH REROOF (BLDG 1) - TO REMOVE AND REPLACE ROOF SHINGLES WITH NO STRUCTURAL...).

How do I get Birmingham permits for my trade every morning?
Start with the free 14-day sample feed for Birmingham, AL: every matching permit in a daily email, no card. One PermitBoards County seat covers every trade in the county on the paid plan.

Why is the Birmingham Permit Index dated by filing date, not issue date?
Birmingham, AL publishes filing dates on its permit register and does not publish an issue date, so this index counts its issued-stage records by the date each was filed (Nov 18, 2026 to Nov 23, 2026). No issue date is inferred or estimated.

Check the actual permits before you pay — free lookup

Search 240,547 issued permits across 73 live markets by ZIP code or city: masked addresses, job descriptions and published job values from the same live feed subscribers get every morning. No signup, no card.

Run a free permit lookup See a sample daily alert

Get permits like these for your trade, every morning

Start with the free 14-day sample feed: the real daily email, built from live permit records for your market. If it doesn't show you work worth chasing, don't pay for it. The paid plan is $29 a month for your market — every trade in the county — month-to-month, no sales call — start it when you're ready.

Start my free 14-day sample feed Start the paid plan — $29/mo See a sample alert first