Start free sample
Coverage Applications & filings States Trades Permit lookup Blog Compare Pricing Start free sample
PermitBoards — Daily permit alerts by county and trade. Free 14-day sample Start the paid plan — $29/mo

Data last updated Monday, November 23, 2026

Birmingham, AL · Electrical board

Electrical Permits in Birmingham, AL

Every electrical permit filed in Birmingham, AL in the 6 days of records we hold ending Nov 23, 2026 — where the work is clustering. Generated from the permit records themselves, rebuilt nightly.

The board in five sentences

34 electrical permits were filed in Birmingham, AL in the 6 days of records we hold ending Nov 23, 2026.

the City of Birmingham publishes job values on too few of these records for a reliable total, so this board tracks counts, types and locations instead.

ZIP 35212 is the busiest electrical territory in Birmingham, AL right now, with 5 of those permits.

Most records carry the City of Birmingham's general "Electrical Permit" type; the work description says what was actually done.

This board holds 1 month of electrical permit records for Birmingham.

34
Permits, 6 days of records
Not published
Declared job value
1
Valued records
19
Active ZIPs
Not listed
Contractor businesses

Birmingham, AL electrical permits, in your inbox tomorrow morning

Start with the free 14-day sample feed: the real daily email, built from live permit records for Birmingham. If it doesn't show you work worth chasing, don't pay for it. The paid plan is $29 a month for Birmingham — every trade in the county — month-to-month, no sales call — start it when you're ready.

Start my free 14-day sample feed Start the paid plan — $29/mo See a sample alert first

Top ZIPs for Electrical work in Birmingham, AL

ZIPPermitsShareDeclared value
35212515%$100
3520739%—
3520839%—
3521726%—
3522226%—
3523526%—
3521126%—
3524326%—
3520526%—
3523326%—

Streets with the most Electrical filings

Street (numbers masked)Permits
S 55Th St S3
N 38Th Ave N2
N 27Th St N2
Redding Way2
N 36Th Ave N1
58Th St1
W Graymont Ave W1
Vassar Ave1

The latest Electrical permits on this board

FiledAddressWorkPublished valueContractor on permit
Nov 23, 20261xxx WINOLA LN, BHAM AL 35235WINOLA REWIRE REWIRENot publishedNot listed
Nov 23, 20261xxx INDIANA ST, BIRMINGHAM AL 352241xxx Indiana Street/[permit #] [permit #] Install low voltage for ThermostatNot publishedNot listed
Nov 20, 20264xxx N 38TH AVE N, BHAM AL 35217[permit #] REPLACED LIGHT FIXTURESNot publishedNot listed
Nov 20, 20264xxx N 2ND AVE N, BHAM AL 352124xxx 2ND AVE NORTH REWIRE TWO BATHROOMSNot publishedNot listed
Nov 20, 20261xxx 31ST ST, BHAM AL 35208Service Upgrade Replace 200 AMP Meter / 100 amp Main Breaker PanelNot publishedNot listed
Nov 20, 20263xxx N 27TH ST N, BHAM AL 352073xxx 27th STREET N INSTALL NEW 400 AMP SERVICENot publishedNot listed
Nov 20, 20263xxx N 27TH ST N, BHAM AL 352073xxx 27th STREET N TEMP/PERMNot publishedNot listed
Nov 20, 20261xxx S 5TH ST S, BHAM AL 35205Grissom Connect low voltage for new hvacNot publishedNot listed
Nov 20, 20263xxx REDMONT RD, BHAM AL 35213Rushton Connect low voltage for new furnaceNot publishedNot listed
Nov 20, 20262xx SUMMIT BLVD, AL 35243MORGAN & MORGAN/SUITE 300/ 2ND & 3RD FLOOR ADDING ACCESS CONTROL TO 2ND & 3RD FLOORS/[permit #]Not publishedNot listed
Nov 20, 20262xxx S ARLINGTON AVE S, AL 35205Bennett Unit 46 Connect low voltage for new heat pumpNot publishedNot listed
Nov 20, 20261xxx S 10TH AVE S, BHAM AL 35294UAB EEC LOW VOLTAGE/DATA BUILDING PERMIT NUMBER [permit #]Not publishedNot listed
Nov 20, 20261xxx S 6TH AVE S, BHAM AL 35233UAB NP 5TH FL PHASE 2 LOW VOLTAGE/DATA BUILDING PERMIT NUMBER [permit #]Not publishedNot listed
Nov 20, 20267xx S 19TH ST S, BHAM AL 35233UAB ZRB 5TH FL LOW VOLTAGE/DATA BUILDING PERMIT NUMBER [permit #]Not publishedNot listed
Nov 19, 20261xxx S 20TH AVE S, BIRMINGHAM AL 352091xxx 20th Ave. Full electrical permit for buildout. Per electrical plans.Not publishedNot listed
Nov 19, 20265xxx S 9TH AVE S, BHAM AL 352125xxx 9th Ave S - 200A Service Disconnect Replacement & Generator Inlet Replace existing outdoor 200A service disconne...Not publishedNot listed
Nov 19, 20263xxx N 1ST AVE N, BHAM AL 352223xxx 1ST AVE N TEMP/PERM POWERNot publishedNot listed
Nov 19, 20262xxx N 18TH AVE N, BHAM AL 35234[name] 200amp Service repairNot publishedNot listed
Nov 19, 20261x S 55TH ST S, APT B, BHAM AL 35212APARTMENT D TEMP POWER$100Not listed
Nov 19, 20261x S 55TH ST S, APT B, BHAM AL 35212B TEMP POWERNot publishedNot listed

Street numbers are masked on the public board; the paid feed carries the full address, the permit number and any contact details the permit itself publishes.

Recent Electrical filings, in the records' own words

Descriptions run exactly as the permit office records them — the wording is the filer's.

What kind of Electrical work is filing

Permit type as publishedPermitsShare
Electrical Permit2059%
Low Voltage Electrical1441%

Electrical permits in Birmingham, AL — month by month

MonthPermitsDeclared value
November 2026 (Nov 18 through Nov 23)34$100

The feed's history for this lane reaches back 6 days — every record it holds is shown; nothing is modeled or back-filled.

How electrical contractors use PermitBoards in Birmingham

34 electrical permits were filed in Birmingham in the 6 days of records we hold through Monday, November 23, 2026. Electrical permits cover the work that most often needs one: service and panel upgrades, new circuits, EV chargers, generators and the wiring inside larger projects.

Electricians and the businesses around them use the list in three ways.

1. Find where the work is. Most records carry the City of Birmingham's general "Electrical Permit" type; the work description says what was actually done. Volume concentrates, led by ZIP 35212. Panel-upgrade and EV-charger volume says a lot about which neighborhoods are electrifying.

2. Work the jobs upstream of you. Many electrical permits ride alongside remodel, addition, solar and new construction work. Watching those lanes in Birmingham shows the projects that will need an electrician before the electrical permit is pulled.

3. Know the competition. the City of Birmingham doesn't publish contractor names on its records, so this feed shows the work itself (type, description, location and date) rather than who pulled it.

Supply houses use the same view to see demand for panels, breakers and EV hardware by area.

One permit can carry several trades, so an electrical permit tied to a remodel is counted in both lanes. That's accurate, but it means lane counts don't add up to the market total.

Where this board comes from

Birmingham, AL publishes these records itself; PermitBoards pulls them on the schedule the source publishes, normalizes them into the trade lanes, and rebuilds this page nightly. Applications are pulled from the same publisher's application filings — submitted applications, before issuance.

Questions this board answers

How many electrical permits were filed in Birmingham in the 6 days of records we hold?

According to PermitBoards permit data, Birmingham recorded 34 electrical permits in the 6 days of records we hold ending Monday, November 23, 2026. The busiest ZIP codes were 35212, 35207 and 35208. A permit that covers several trades is counted in each lane it names.

How current is the Birmingham electrical permit data?

Applications are pulled from the same publisher's application filings — submitted applications, before issuance. The newest record in this feed is dated Monday, November 23, 2026. If the City of Birmingham stops publishing, this page shows a "Data last updated" date instead of presenting old records as new.

Does the Birmingham feed show which contractors pulled electrical permits?

the City of Birmingham's records name the filer on many permits, but most aren't business names, and we never show individuals' names publicly. Filer details as published are in the paid feed.

Can I see electrical permits in Birmingham before they're approved?

Partly. Birmingham publishes permits at the filing stage, so you see them when they're filed, but it doesn't publish review-stage updates.

What's in a Birmingham electrical permit alert?

Each alert lists the permit's date, address, permit type and work description as the City of Birmingham publishes them. Public pages and previews mask street numbers. Full addresses are in the paid feed, CSV export.

How much does it cost to get electrical permits for Birmingham?

Plans start at $19 a month for one ZIP code and one trade. All of Birmingham — every trade in the county — is $29 a month, with the first 50 shops locking in $19 a month for life while founding spots remain. You can try the feed free for 14 days, no card required.

What kinds of electrical permits appear in Birmingham?

Whatever the City of Birmingham records as electrical work, commonly service and panel upgrades, new circuits, EV chargers and generators. Most records carry the City of Birmingham's general "Electrical Permit" type; the work description says what was actually done.

Why do some electrical permits also appear in other lanes?

Because many projects involve more than one trade. A remodel with new wiring is counted in both the remodel and electrical lanes, so lane totals can add up to more than the market total. Every permit is still counted once in the market total.

How can electricians use permits pulled by other trades?

Remodel, addition, solar and new construction permits often signal electrical work before an electrical permit exists. Watching those lanes in Birmingham shows the projects that will need an electrician.

See your county's permits before you pay anything

Start with the free 14-day sample feed: the real daily email, built from live permit records for Birmingham. If it doesn't show you work worth chasing, don't pay for it. The paid plan is $29 a month for Birmingham — every trade in the county — month-to-month, no sales call — start it when you're ready.

Start my free 14-day sample feed Start the paid plan — $29/mo See a sample alert first

Check the actual permits before you pay — free lookup

Search 240,547 issued permits across 73 live markets by ZIP code or city: masked addresses, job descriptions and published job values from the same live feed subscribers get every morning. No signup, no card.

Run a free permit lookup See a sample daily alert