Start free sample
Coverage Applications & filings States Trades Permit lookup Blog Compare Pricing Start free sample
PermitBoards — daily permit alerts by county and trade. Start the paid plan — $29/mo Free 14-day sample

Home › Blog › Permit applications at the 'Corrections or more information requested' stage — what it means for contractors

Permit applications at the 'Corrections or more information requested' stage — what it means for contractors

Start a free 14-day sample feed for your county

Corrections or more information means the city pushed back. The reviewer found something — a missing detail, a code conflict, a document that needs to be redone — and sent the application back to the applicant's team to fix. It reads like a setback, but it is a normal, funded step: the applicant paid to file, and applicants who abandon projects rarely resubmit.

PermitBoards tracks 3,216 applications at exactly this stage across the 9 markets that publish application-stage data — every one of them a real project moving toward construction.

Where this stage sits in the sequence

This stage sits between review rounds. The application leaves review with a list, waits on the architect, engineer, or expediter to answer it, then re-enters review. Projects can cycle here more than once. For contractors, a project in corrections is not dead — it is delayed, and its start date is moving, which is exactly the kind of change worth tracking.

Markets with the most corrections or more information requested applications

MarketApplications at this stage
New York City, NY1,307
Los Angeles, CA1,120
Fort Worth, TX291
Norfolk, VA169
Maricopa County, AZ132

The newest filings at this stage

These are the most recent applications to reach the corrections or more information requested stage in the markets that publish filings:

  • KENTUCKY DERBY LN 76179 — B1_WORK_DESC — Randles Rainbow Inc. (Fort Worth, TX, filed Nov 16, 2026)
  • 8xxx SIMONS DRIVE — Homestay (Norfolk, VA, filed Nov 16, 2026)
  • 1xxx LONGWOOD DRIVE — Building (Norfolk, VA, filed Nov 15, 2026)
  • 3xxx DAVIS STREET — Addition - Increase Square Footage/Interior Expansion — One/Two Family Dwelling (Norfolk, VA, filed Nov 15, 2026)
  • 4xxx 45TH ST NW, WASHINGTON, DC 20016 — Licensed Professional - Doctor's Office (Washington, DC, filed Nov 13, 2026)
  • 1xxx EUCLID ST NW, WASHINGTON, DC 20009 — Cottage Foods (Washington, DC, filed Nov 13, 2026)

What this stage means for your pipeline

A corrections request means the city found gaps — missing details, code conflicts, documents to resubmit. The ball is with the applicant's design team. Timelines stretch here, but the project is alive and funded enough to keep pushing; it is not a dead lead.

Applications at the corrections or more information requested stage are 13% of the 23,957 in-process applications PermitBoards currently tracks. General contractors read filings at this stage as their earliest actionable list. Subcontractors and suppliers read the issued-permit feed the same way one step later, when the GC who won the job starts buying. PermitBoards carries both in one seat — see the applications hub for the markets where filings are live.

Frequently asked questions

What does 'Corrections or more information requested' mean on a permit application?
It means The city sent the application back for fixes or missing information.

How many applications are at the corrections or more information requested stage right now?
PermitBoards' database holds 3,216 applications at this stage across the 9 markets that publish application data.

Should contractors call on corrections or more information requested applications?
Applications are the early signal: the project is real and public, but the permit has not issued, so hiring is often still open. Issued permits, by contrast, usually name a contractor already chosen.

Check the actual permits before you pay — free lookup

Search 85,801 issued permits across 31 live markets by ZIP code or city: real addresses, job descriptions and published job values from the same live feed subscribers get every morning. No signup, no card.

Run a free permit lookup See a sample daily alert

Get permits like these for your trade, every morning

Start the paid plan when you're ready — $29 a month for one county — every trade in it — month-to-month, no sales call. Or start with a free 14-day sample feed: the real daily email, built from live permit records. If it doesn't show you work worth chasing, don't pay for it.

Start the paid plan — $29/mo Free 14-day sample See a sample alert first