Permit applications at the 'In review / plan check' stage — what it means for contractors
Start a free 14-day sample feed for your county
An application in review is sitting on a plan reviewer's desk. The city is checking the drawings against building, zoning, fire, and trade codes, and the outcome is genuinely uncertain: clean sets pass, flawed sets come back with corrections. This is the stage where a project's real timeline is decided, and where experienced contractors learn to read momentum.
PermitBoards tracks 9,379 applications at exactly this stage across the 35 markets that publish application-stage data — every one of them a real project moving toward construction.
Where this stage sits in the sequence
In review is the middle of the sequence: filed applications arrive here, and from here they branch — straight to approved on a clean pass, or sideways into corrections and resubmittal rounds that can add weeks. An application that clears review quickly usually belongs to a team that files clean work, which is itself a signal about who is active and competent locally.
Markets with the most in review / plan check applications
| Market | Applications at this stage |
|---|---|
| New York City, NY | 4,289 |
| Los Angeles, CA | 844 |
| Cleveland, OH | 474 |
| Maricopa County, AZ | 434 |
| Sacramento, CA | 356 |
The newest filings at this stage
These are the most recent applications to reach the in review / plan check stage in the markets that publish filings:
- 5xx LINDBERGH * — Russell Murray Special exception B (El Paso, TX, filed Nov 20, 2026)
- 5xxx EMMITT SMITH * — CAREFREE HOMES NEW RESIDENTIAL HOME (El Paso, TX, filed Nov 20, 2026)
- 5xxx EMMITT SMITH * — CAREFREE HOMES NEW RESIDENTIAL HOME (El Paso, TX, filed Nov 20, 2026)
- 1xx 5th Ave SE, Ruskin FL 33570 — Telecommunications spectrum/charter INSTALL 150' OF COAX CABLE AND CONDUIT VIA DIRECTIONAL BO... (Hillsborough County, FL, filed Nov 20, 2026)
- 6xx E Brandon Blvd, Brandon FL 33511 — telecommunications spectrum/charter INSTALL 165' OF .625 CABLE AND CONDUIT VIA DIRECTIONAL BO... (Hillsborough County, FL, filed Nov 20, 2026)
- 1xxxx Grovewood Ave, Thonotosassa FL 33592 — New Front porch New rear porch with carport new detached RV car port (Hillsborough County, FL, filed Nov 20, 2026)
What this stage means for your pipeline
Plan check is where projects stall or sail. Reviewers are reading the drawings now; a clean set can clear in one pass, a messy one bounces to corrections. Contractors watch this stage to time bids — work that clears review tends to start within weeks of issuance.
Applications at the in review / plan check stage are 31% of the 30,083 in-process applications PermitBoards currently tracks. General contractors read filings at this stage as their earliest actionable list. Subcontractors and suppliers read the issued-permit feed the same way one step later, when the GC who won the job starts buying. PermitBoards carries both in one seat — see the applications hub for the markets where filings are live.
Frequently asked questions
What does 'In review / plan check' mean on a permit application?
It means City reviewers are checking the plans against code.
How many applications are at the in review / plan check stage right now?
PermitBoards' database holds 9,379 applications at this stage across the 35 markets that publish application data.
Should contractors call on in review / plan check applications?
Applications are the early signal: the project is real and public, but the permit has not issued, so hiring is often still open. Issued permits, by contrast, usually name a contractor already chosen.