Start free sample
Coverage Applications & filings States Trades Permit lookup Blog Compare Pricing Start free sample
PermitBoards — daily permit alerts by county and trade. Start the paid plan — $29/mo Free 14-day sample

Home › Blog › New Orleans permit applications: what's in the pipeline — November 2026

New Orleans permit applications: what's in the pipeline — November 2026

Start a free 14-day sample feed for your county

New Orleans, LA currently has 938 building-permit applications that are filed but not yet issued, counted over the filings window Oct 14, 2026 to Nov 12, 2026 from the city's own published application records. The largest single group, 518 filings, sits at 'Filed'.

The pipeline by stage

StageApplicationsShareNewest filing at this stage
Filed51855%1xxx Teche St New Orleans LA 70114 (Nov 12, 2026)
In review / plan check21022%4xxx Iroquois St New Orleans LA 70126 (Nov 11, 2026)
Corrections or more information requested384%1xxx S Carrollton Ave New Orleans LA 70118 (Nov 11, 2026)
Approved, awaiting issue17218%3xxx Name not published 70125 (Nov 11, 2026)

New Orleans's pipeline is front-loaded with fresh work: 518 filings (55% of 938) are at the filed stage, submitted and waiting for review to start. Fresh filings are the earliest public signal a job exists — the owners behind them filed between Oct 14, 2026 and Nov 12, 2026 and are at the point of choosing who builds. Further along, 172 filings have already cleared review and sit approved, awaiting issue and 210 filings are in review.

The trade mix in New Orleans's pipeline

TradeApplicationsShare
Other / general33836%
Remodel & addition16217%
Plumbing14916%
HVAC10711%
Electrical10311%

Remodel & addition is the largest classified trade in the pipeline with 162 filings (17% of all 938). Within that lane, the filings bunch at 'Filed': 73 of the 162 are there, so remodel & addition crews watching New Orleans are mostly looking at the application has been submitted to the city and is waiting for review to start. The next lane is plumbing with 149 filings.

The biggest jobs in New Orleans's pipeline

Ranked by the job value the applicant published on the filing itself. The largest, at 3xxx Calhoun St New Orleans LA 70125, is a $13,340,888 job currently at 'Filed' — the kind of project whose sub and supplier decisions are worth the most to the trades that land them.

AddressFiledStagePublished value
3xxx Calhoun St New Orleans LA 70125Oct 30, 2026Filed$13,340,888
5xxx N Miro St New Orleans LA 70117Nov 2, 2026Filed$2,870,000
1xxx Law St New Orleans LA 70119Oct 16, 2026Filed$2,500,000
4xx Race St New Orleans LA 70130Nov 2, 2026Filed$2,500,000
4xxx Dauphine St New Orleans LA 70117Oct 22, 2026Filed$1,184,302

Newest filings on the board

  • 1xxx Teche St New Orleans LA 70114 — Install new air conditioner (Filed; Nov 12, 2026)
  • 1xxx Teche St New Orleans LA 70114 — New air conditioner install (Filed; Nov 12, 2026)
  • 1xxx Poydras St, Suite 1xxx New Orleans LA — Installation of one instantons water heater under the sink (Filed; Nov 11, 2026)
  • 1xxx Poydras St, Suite 1xxx New Orleans LA — renovation of a new HVAC duct system with new electric VAV boxes (Filed; Nov 11, 2026)
  • 9xx Bienville St New Orleans LA 70112 — Electrical permit for renovation replacing all electrical wires, or outlets and lighting (Filed; Nov 11, 2026)
  • 9xx Saint Louis St HM, Unit 5 & x New Orleans LA — Roof replacement on Back building and laundry room with new 18"x 12" Vermont Semi- Weathering Gray slate. All flashin... (Filed; Nov 11, 2026)

Subscribers in New Orleans, LA see new filings every morning with their stage, next to the issued permits for their trade — applications are included in the same county + trade seat, never a separate charge. The market's full picture is on the New Orleans, LA coverage page and the applications hub.

Frequently asked questions

How many unissued permit applications does New Orleans, LA have?
938 applications were filed but not yet issued in the latest filings window (Oct 14, 2026 to Nov 12, 2026).

Which stage holds the most New Orleans applications?
'Filed' — 518 of the 938 filings (55%), meaning the application has been submitted to the city and is waiting for review to start.

What trades are filing the most applications in New Orleans?
Remodel & addition leads the classified trades with 162 filings, followed by plumbing (149) and hvac (107).

Does New Orleans publish applicant [name] on applications?
PermitBoards shows every field the city itself publishes on the record and never appends bought contact data; where the filing publishes no phone, none is shown.

How long does permitting take in New Orleans?
Across the 32 permits in our records with both a filing and an issue date, the median filing-to-issue time is 7 days.

Check the actual permits before you pay — free lookup

Search 85,801 issued permits across 31 live markets by ZIP code or city: real addresses, job descriptions and published job values from the same live feed subscribers get every morning. No signup, no card.

Run a free permit lookup See a sample daily alert

Get permits like these for your trade, every morning

Start the paid plan when you're ready — $29 a month for one county — every trade in it — month-to-month, no sales call. Or start with a free 14-day sample feed: the real daily email, built from live permit records. If it doesn't show you work worth chasing, don't pay for it.

Start the paid plan — $29/mo Free 14-day sample See a sample alert first