Data last updated Friday, October 23, 2026
Sacramento, CA · New construction board
Every new construction permit issued in Sacramento, CA in the last 30 days ending Oct 25, 2026 — where the work is clustering, what the jobs are worth, and how the month compares with this feed's full history. Generated from the permit records themselves, rebuilt nightly.
15 new construction permits were issued in Sacramento, CA in the last 30 days ending Oct 25, 2026.
Those permits carry $3,163,994 in declared job value, as recorded on the permits, across 13 valued records; declared values often cover the whole project, not only the new construction work.
ZIP 95815 is the busiest new construction territory in Sacramento, CA right now, with 3 of those permits.
The most common new construction permit type in Sacramento is Residential.
Another 10 new construction records were still applications, before approval.
Start with the free 14-day sample feed: the real daily email, built from live permit records for Sacramento. If it doesn't show you work worth chasing, don't pay for it. The paid plan is $29 a month for Sacramento — every trade in the county — month-to-month, no sales call — start it when you're ready.
Start my free 14-day sample feed Start the paid plan — $29/mo See a sample alert first
| ZIP | Permits | Share | Declared value |
|---|---|---|---|
| 95815 | 3 | 20% | $279,339 |
| 00000 | 2 | 13% | — |
| 95822 | 2 | 13% | $1,101,064 |
| 95814 | 2 | 13% | $59,346 |
| 95819 | 2 | 13% | $41,856 |
| 95818 | 2 | 13% | $108,896 |
| 95833 | 1 | 7% | $653,721 |
| 95831 | 1 | 7% | $919,771 |
| Street (numbers masked) | Permits |
|---|---|
| Unknown 00000 | 2 |
| Wilson Ave 95833 | 1 |
| Otto Cir 95822 | 1 |
| 25Th St 95822 | 1 |
| I St 95814 | 1 |
| Capitol Mall 1525 95814 | 1 |
| Fairfield St 95815 | 1 |
| San Antonio Way 95819 | 1 |
| Date | Address | Work | Published value | Contractor on permit |
|---|---|---|---|---|
| Oct 23, 2026 | 1xx OTTO CIR 95822 | EPC - EXPEDITED Shared Plans (3)- 2,324sf Shop garage rebuild fire destroyed building.(New construction) Panel upgrad... | $150,711 | Not published |
| Oct 21, 2026 | x UNKNOWN 00000 | Installation of EV charging stations in parking lot. Continuing from already appproved, pre-installed conduits. — IBE... | Not published | PHE INC |
| Oct 21, 2026 | 9xx PERKINS WAY 95818 | REPLACE SIDING ON ENTIRE HOUSE. REMOVE EXISTING SIDING. INSTALL NEW R-15 INSULATION. INSTALL NEW OSB PLYWOOD. INSTALL... | $47,896 | DL DESIGN CONSTRUCTION INC |
| Oct 20, 2026 | 6xx CAPITOL MALL 1525 95814 | EXPEDITED - REMODEL OF OFFICE SPACE TO INCLUDE DEMOLITION, AND NEW CONSTRUCTION WITH WALLS, DOOR, FINISHES, LIGHTING... | $43,346 | JONES AND LAMBERTI BUILDERS INC |
| Oct 20, 2026 | 1xxx BOWLING GREEN DR 95815 | FINAL INSPECTION ONLY TO COMPLETE WORK FOR EXPIRED PERMIT 9800859. (1998 ROOM ADDITION, 249 SQ FT). NO NEW CONSTRUCTI... | $2,185 | Not published |
| Oct 16, 2026 | 2x RIVERSHORE CT 95831 | EPC - DUE TO LIMITATIONS OF RECONSTRUCTION. THIS PERMIT WILL REPLACE RES-2525938 WHEN ISSUED. New single family dwell... | $919,771 | Not published |
| Oct 16, 2026 | 2xxx BELDEN ST 95815 | EPC - New construction detached ADU, 748 sq ft, 2bed/2bath with sprinklers and 2.15kw solar system. Carbon monoxide &... | $141,422 | MURADU CONSTRUCTION INC |
| Oct 15, 2026 | 6xxx 25TH ST 95822 | MULTI-FAMILY HOUSING - EPC - CITY FACILITY PROJECT - MICRO COMMUNITY - CDD INSPECTED - INTERIM HOUSING PROJECT. SCOPE... | $950,353 | Not published |
| Oct 14, 2026 | 5xx SANDBURG DR 95819 | REPLACE 14 WINDOWS WITH NEW CONSTRUCTION WINDOWS THE EGRESS WINDOWS WILL MEET THE CODE REQUIREMENTS ENFORCED AT THE T... | $14,000 | FLORIN GLASS TECH |
| Oct 12, 2026 | x UNKNOWN 00000 | New single-family dwelling and attached ADU — Stone Bridge Residence- 4xxx 43rd St. | Not published | Not published |
| Oct 2, 2026 | 6xx SAN ANTONIO WAY 95819 | EPC - Construct new 20X20 400sf Tuffshed Garage No MEP. Carbon monoxide & Smoke alarms required. Reference CRC sectio... | $27,856 | TUFF SHED INC |
| Oct 1, 2026 | 1xxx I ST 95814 | BALCONY REPAIR Unit #827: REMOVE EXISTING SIDING AT WALL BASE AND SAVE FOR REINSTALL, REMOVE EXISTING WATERPROOFING,... | $16,000 | GOOD LIFE CONSTRUCTION INC |
| Sep 30, 2026 | 5xx WILSON AVE 95833 | EPC - NEW CONSTRUCTION 2 STORIES TRIPLEX HOUSE UNIT 1: 1ST FLOOR LIVING AREA:= 551 SQ.FT. UNIT 1: 2ND FLOOR LIVNG ARE... | $653,721 | Not published |
| Sep 30, 2026 | 2xxx FAIRFIELD ST 95815 | “Shelf-Ready ADU Submittal, Cycle Times 10, 7, 5, 3 EPC - New Construction of 747SF detached ADU, 2bed/2bath. Carbon... | $135,732 | Not published |
| Sep 28, 2026 | 1xxx 10TH AVE 95818 | EPC - Construct a new 107 SF first-story addition within the existing rear covered patio area. Retain the existing ro... | $61,000 | B & B HARVEY CONSTRUCTION INC |
Street numbers are masked on the public board; the paid feed carries the full address, the permit number and any contact details the permit itself publishes.
Descriptions run exactly as the permit office records them — the wording is the filer's.
| Permit type as published | Permits | Share |
|---|---|---|
| Residential | 8 | 53% |
| Commercial | 4 | 27% |
| County Fire | 2 | 13% |
| Facilities Permit Program | 1 | 7% |
The largest counted declared value in the window is $950,353 in declared job value, as recorded on the permits — a commercial issued Oct 15, 2026 at 6xxx 25TH ST 95822; declared values often cover the whole project, not only the new construction work.
| Date | Address | Work | Published value | Contractor on permit |
|---|---|---|---|---|
| Oct 15, 2026 | 6xxx 25TH ST 95822 | MULTI-FAMILY HOUSING - EPC - CITY FACILITY PROJECT - MICRO COMMUNITY - CDD INSPECTED - INTERIM HOUSING PROJECT. SCOPE... | $950,353 | Not published |
| Oct 16, 2026 | 2x RIVERSHORE CT 95831 | EPC - DUE TO LIMITATIONS OF RECONSTRUCTION. THIS PERMIT WILL REPLACE RES-2525938 WHEN ISSUED. New single family dwell... | $919,771 | Not published |
| Sep 30, 2026 | 5xx WILSON AVE 95833 | EPC - NEW CONSTRUCTION 2 STORIES TRIPLEX HOUSE UNIT 1: 1ST FLOOR LIVING AREA:= 551 SQ.FT. UNIT 1: 2ND FLOOR LIVNG ARE... | $653,721 | Not published |
| Oct 23, 2026 | 1xx OTTO CIR 95822 | EPC - EXPEDITED Shared Plans (3)- 2,324sf Shop garage rebuild fire destroyed building.(New construction) Panel upgrad... | $150,711 | Not published |
| Oct 16, 2026 | 2xxx BELDEN ST 95815 | EPC - New construction detached ADU, 748 sq ft, 2bed/2bath with sprinklers and 2.15kw solar system. Carbon monoxide &... | $141,422 | MURADU CONSTRUCTION INC |
| Month | Permits | Declared value |
|---|---|---|
| August 2026 (Aug 21 through Aug 28) | 4 | $137,000 |
| September 2026 (from Sep 10) | 12 | $2,810,267 |
| October 2026 (through Oct 23) | 12 | $2,313,540 |
The feed's history for this lane reaches back 3 months — every month it holds is shown; nothing is modeled or back-filled. Latest month versus the prior 30 days: up 36%.
Totals use declared job value, as recorded on the permits; declared values often cover the whole project, not only the new construction work. A declared value repeated for one project at one address counts once, and project-level values are left out.
| Declared value | Permits | Share of valued permits |
|---|---|---|
| Under $1,000 | 0 | 0% |
| $1,000 – $5,000 | 1 | 8% |
| $5,000 – $25,000 | 2 | 15% |
| $25,000 – $100,000 | 4 | 31% |
| $100,000 and up | 6 | 46% |
15 new construction permits were issued in Sacramento in the last 30 days through Sunday, October 25, 2026, up 36% from the prior 30 days. New construction permits mark the biggest projects in the feed: new houses, multifamily buildings, commercial structures and accessory buildings, as the record describes them. A single permit can mean months of work for a long line of trades.
Why trades watch this lane first: - Bidding window. Work is awarded in sequence, typically site work and foundations first, then framing, mechanical, electrical and plumbing rough-in, roofing, insulation and drywall, finishes, and finally landscaping, fencing and flatwork. Seeing the permit early means bidding before your stage is awarded. - Pipeline planning. Monthly new-construction volume in Sacramento is a forward indicator of how busy every trade will be over the next quarters.
The largest valued new construction permit this period was $950,352 on 6xxx 25TH ST 95822. New construction is concentrated in ZIP 95815, 00000 and 95822. Sacramento publishes applications, so 10 new construction records were visible pre-issue. For large projects, that's often weeks of extra lead time.
Sacramento, CA publishes these records itself; PermitBoards pulls them on the schedule the source publishes, normalizes them into the trade lanes, and rebuilds this page nightly. Applications are pulled from the same publisher's application filings — submitted applications, before issuance.
According to PermitBoards permit data, Sacramento recorded 15 new construction permits in the last 30 days ending Sunday, October 25, 2026, up 36% from the 30 days before. The busiest ZIP codes were 95815, 00000 and 95822. A permit that covers several trades is counted in each lane it names.
Applications are pulled from the same publisher's application filings — submitted applications, before issuance. The newest record in this feed is dated Sunday, October 25, 2026. If the City of Sacramento stops publishing, this page shows a "Data last updated" date instead of presenting old records as new.
the City of Sacramento's records name the filer on many permits, but most aren't business names, and we never show individuals' names publicly. Filer details as published are in the paid feed.
Yes. Sacramento publishes permit applications, and we track them through filed, in review, corrections requested and approved stages. 10 new construction records were in a pre-issue stage in the last 30 days. Applications are included in the same subscription.
Each alert lists the permit's date, address, permit type, job value and work description as the City of Sacramento publishes them. Public pages and previews mask street numbers. Full addresses are in the paid feed, CSV export and county report.
Plans start at $19 a month for one ZIP code and one trade. All of Sacramento — every trade in the county — is $29 a month, with the first 50 shops locking in $19 a month for life while founding spots remain. A one-time report covering the last 30 days of new construction permits for Sacramento is $29 (PDF + CSV). You can try the feed free for 14 days, no card required.
Permits for new structures, such as single-family homes, multifamily buildings, commercial buildings and accessory structures, as the City of Sacramento describes them. In Sacramento, the most common new construction permit types this period were Residential and Commercial.
Typically site work and foundations first, then framing, then mechanical, electrical and plumbing rough-in and roofing, followed by insulation and drywall, finishes, and finally landscaping, fencing and flatwork. Seeing the permit early lets you bid before your stage is awarded.
The largest valued new construction permit in the last 30 days was $950,352 on 6xxx 25TH ST 95822, out of $3,163,994 in declared job value, as recorded on the permits, across 13 valued records; declared values often cover the whole project, not only the new construction work.
Start with the free 14-day sample feed: the real daily email, built from live permit records for Sacramento. If it doesn't show you work worth chasing, don't pay for it. The paid plan is $29 a month for Sacramento — every trade in the county — month-to-month, no sales call — start it when you're ready.
Start my free 14-day sample feed Start the paid plan — $29/mo See a sample alert first
Every new construction permit Sacramento, CA published in the last 30 days of this feed (Sep 26, 2026 – Oct 25, 2026), as a PDF report plus the full spreadsheet (CSV), delivered by email. One-time purchase — no subscription, no account. A snapshot goes stale; subscribers got each of these in the morning digest after the city published it.
Search 240,547 issued permits across 73 live markets by ZIP code or city: masked addresses, job descriptions and published job values from the same live feed subscribers get every morning. No signup, no card.