The Portland Permit Index — week of Thursday, November 19, 2026
Start a free 14-day sample feed for your county
Portland, OR issued 17 building permits dated Oct 28, 2026 to Nov 19, 2026 — every roof, remodel, panel upgrade, and new build in the register for those 9 dated days, with the address and what the job is. Almost nobody reads them. The Permit Index does: this post is built entirely from those 17 permits in our database for Portland, OR, pulled from the jurisdiction's own published records. No estimates, no padding — if a number is here, it is counted from those records. The busiest lane was demolition & dumpster.
How this market is dated: every record here is counted by the issue date Portland, OR itself publishes on the permit. Applications still in review are a separate lane on the coverage page and are not counted in this index.
The week in numbers
Portland, OR issued 17 permits in this window. The busiest lane was demolition & dumpster. The feed's own status and latest dates are on the Portland, OR coverage page.
| Trade lane | Permits in window |
|---|---|
| Demolition & dumpster | 17 |
| Plumbing | 7 |
What the records themselves show
Of the 17 permits counted here, none publish a job value — this feed does not carry a value field, so none are shown or estimated. A contractor or applicant name is published on 0 of them (0%), and a work description on 17 (100%). The permit types that appear most are: Demolition (17). That mix is what a crew chief is really reading: the type and description say what the job is, the lane says whose work it is, and the published value — where the feed carries one — says how big it is. Records that publish no value are counted, never estimated.
Largest published job values
| Address | Issued | Published value |
|---|---|---|
| This market's feed publishes no job values. | ||
Five of the newest permits
| Date | Address | Work | Published value | Contractor on permit |
|---|---|---|---|---|
| Nov 19, 2026 | 6xxx SE SCOTT DR PORTLAND | SINGLE PDF - SB871: DEMOLISH DETACHED ACCESSORY STRUCTURE. REMOVE ALL DEBRIS. — Demolition | Not published | Not published |
| Nov 18, 2026 | 7xxx SE OGDEN ST PORTLAND | SINGLEPDF, SB871: DEMOLISH GARAGE AND RETAIN SLAB, REMOVE ALL DEBRIS**REFER TO 23-092403-HS — Demolition | Not published | Not published |
| Nov 17, 2026 | 6xx SE 34TH AVE PORTLAND | SB871: DEMOLISH GARAGE, REMOVE ALL DEBRIS. DRIVEWAY TO BE REMOVED. W/26-067681 RS — Demolition | Not published | Not published |
| Nov 16, 2026 | 5xxx NE 14TH PL PORTLAND | SINGLE PDF - SB871: DECONSTRUCT SINGLE-FAMILY RESIDENCE. BASEMENT CAVITY TO BE FILLED. CAP SEWER. REMOVE DRIVEWAY. RE... | Not published | Not published |
| Nov 16, 2026 | 6xx SE 34TH AVE PORTLAND | SB871: DECONSTRUCT SINGLE FAMILY RESIDENCE WITH BASEMENT. CAVITY TO BE FILLED. CAP SEWER, REMOVE ALL DEBRIS. DRIVEWAY... | Not published | Not published |
Subscribers in Portland, OR got each of these in the morning digest for their trade — the full feed, daily, is on the Portland, OR page. Lane pages from this index: Portland demolition & dumpster permits · Portland plumbing permits. The one-off Portland, OR report (last 30 days, $29) carries the whole window as PDF + CSV.
This index in one line: 17 permits in demolition & dumpster, 7 permits in plumbing — this feed publishes no job values, so the index ranks by count and recency
Frequently asked questions
How many building permits did Portland, OR issued this week?
17 permits, Oct 28, 2026 to Nov 19, 2026, counted from the jurisdiction's own published records. The busiest lane was demolition & dumpster.
What is the biggest job permitted in Portland this week?
This market's feed publishes no job values, so the index ranks by count and recency only.
How do I get Portland permits for my trade every morning?
Start with the free 14-day sample feed for Portland, OR: every matching permit in a daily email, no card. One PermitBoards County seat covers every trade in the county on the paid plan.