New York City demolition & dumpster permits in November 2026 — the timing picture
Start a free 14-day sample feed for your county
New York City, NY issued 105 demolition & dumpster permits in its latest 30-day window, Oct 13, 2026 to Nov 11, 2026 — 1% of all 8,124 permits the market issued in that window. Every figure in this post is counted from New York City, NY's own published records in the PermitBoards database; nothing is estimated.
What the count means for demolition & dumpster crews
A demolition permit is the first public sign a parcel is about to change. Here that is 105 of 8,124 permits in the window Issued counts here are a leading indicator for everything else: what comes down in this window is usually followed by new-construction filings on the same ground within months.
The median published value on this lane's permits is $69,861.
Who is pulling New York City's demolition & dumpster permits
| Filer (as published) | Demolition & dumpster permits in window |
|---|---|
| PRECISION HOME DEV INC | 4 |
| DTO ALTERATIONS LLC | 3 |
| GRAMERCY ELECTRIC INC | 3 |
The lane's work clusters in ZIP codes 10017 (8), 10022 (6), 10010 (6) — the rest spreads across 56 ZIP codes in the published addresses.
Inside the window, demolition & dumpster issuance in New York City, NY peaked in the first week: the weekly counts ran 41, 27, 21, 15, 1. The newest of them are listed below.
This lane in New York City, by the numbers
| Lane rank in New York City, NY | #6 of 9 |
| Distinct named filers on this lane | 83 |
| Top filer's share of the lane | 4% |
| Total published value on this lane | $36,736,947 |
Demolition & dumpster is 1% of everything New York City, NY issued in the window. In the market's lane table, only electrical (154) ran hotter in New York City, NY this window and new construction (74) sits just behind.
Demolition & dumpster applications still in the pipeline
479 demolition & dumpster applications from New York City, NY are filed but not yet issued in the filings window Oct 19, 2026 to Nov 17, 2026: 22 filed, 218 in review, 32 in corrections, 207 approved and awaiting issue. These are the jobs whose crews are not final yet.
The biggest demolition & dumpster jobs by published value
| Address | Filed | Published value |
|---|---|---|
| 2xx PARK AVENUE Manhattan 10017 | Oct 16, 2026 | $11,412,516 |
| x LIBERTY PLAZA Manhattan 10006 | Nov 4, 2026 | $5,498,100 |
| 7xx 7 AVENUE Manhattan 10019 | Oct 22, 2026 | $4,000,100 |
| 1xxx FLATBUSH AVENUE Brooklyn 11226 | Oct 13, 2026 | $2,551,675 |
| 7x GREENE STREET Manhattan 10012 | Oct 13, 2026 | $1,697,000 |
Five of the newest demolition & dumpster permits
- 3x-xx 31 AVENUE Queens 11106 — Remove violation #39162664H. Complete the job started by unknown contractor. Demolition the existing wiring. (Nov 10, 2026)
- 1xxx JEROME AVENUE Bronx 10452 — MECHANICAL DEMOLITION EQUIPMENT USE (Nov 9, 2026)
- 5x A JEFFERSON AVENUE Brooklyn 11216 — construction fence installed to protect site, during HPD & DOB IED demolition. (Nov 6, 2026)
- 5x WATER STREET Manhattan 10041 — Modification to mechanical systems on part of 1st floor. Demolition and reconnecting of existing after demo done. (Nov 6, 2026)
- 1xx WEST 31 STREET Manhattan 10001 — Minor demolition, installation of partitions, doors & ceilings on the 4th floor (TPG Office Reconfiguration) as per plans. No c... (Nov 6, 2026)
Demolition & dumpster contractors subscribed in New York City, NY — 105 demolition & dumpster permits this window — get this lane, and only this lane, every morning, including the 479 demolition & dumpster filings above while they are still in review, and the next filing by PRECISION HOME DEV INC in the morning digest after the city publishes it. See the New York City demolition & dumpster permit page or the New York City, NY coverage page.
Frequently asked questions
How many demolition & dumpster permits did New York City, NY issue in the latest 30-day window?
105 demolition & dumpster permits, counted from New York City, NY's own published records for Oct 13, 2026 to Nov 11, 2026.
When does a demolition & dumpster permit become a job lead in New York City?
A demolition filing is the earliest lead in construction: the parcel is about to clear, and hauling, abatement, fencing, and site services are bought at exactly that moment. In New York City, NY this window, that is 105 issued demolition & dumpster permits and 479 applications still unissued. Issuance confirms the start; the redevelopment filing that usually follows is the second lead on the same ground.
How many demolition & dumpster applications are still unissued in New York City?
479 in the latest filings window, 218 of them at 'In review / plan check': filed but not yet issued, so the work has not started. That dominant stage is 46% of this lane's pipeline.
How long do demolition & dumpster permits take to issue in New York City?
Across the 33 demolition & dumpster permits in our records that carry both a filing and an issue date, the median time from filing to issue is 12 days.
Who is filing the most demolition & dumpster permits in New York City?
PRECISION HOME DEV INC leads the named filers on this lane's records in the window with 4 permits, counted from the records themselves.