Start free sample
Coverage Applications & filings States Trades Permit lookup Blog Compare Pricing Start free sample
PermitBoards — daily permit alerts by county and trade. Start the paid plan — $29/mo Free 14-day sample

Home › Blog › How new construction permits work — and how to read them like a pro

How new construction permits work — and how to read them like a pro

Start a free 14-day sample feed for your county

If you sell to new construction contractors, this is your raw material: 3,009 new construction permits issued in the latest 30-day windows across PermitBoards' live markets — 2% of all permits in the database, led by Austin, TX. Each is a public record of a real job at a real address, filed with or cleared by the city that issued it.

What a new construction permit tells you

A new-construction permit is the largest record in any feed: a house, a building, a development phase. Values run from six figures to tens of millions, the review cycle is the longest, and the application pipeline is therefore the deepest. One filing can mean a year of work for a dozen trades.

Where new construction permits are moving

MarketNew construction permits, latest 30-day window
Austin, TX793
Dallas, TX674
Chicago, IL139
Fort Worth, TX134
San Antonio, TX126
Philadelphia, PA110

The biggest new construction jobs in the database

AddressMarketPublished value
5xx E 3RD STAustin, TX$812,383,209
5xx E 3RD STAustin, TX$812,383,209
5xx E 3RD STAustin, TX$812,383,209
5xx E 3RD STAustin, TX$812,383,209
ASPHALT DR 76131Fort Worth, TX$275,000,000

New construction permits by month

Month issuedPermits
June 202682
July 2026247
August 2026158
September 2026298
October 20262,147
November 20261,534

Most active new construction filers, last 90 days

Name on the recordFilings
Name not published167
ELEVATED ENGINEERING NYC89
Victory Plumbing Company75
IES Residential, Inc.45
STRUCTURAL ENGINEERING TECHNOLOGIES43

Newest new construction permits in the database

  • 1xxx Lowerline St New Orleans LA 70118 — Wiring for new construction with a new service (New Orleans, LA, Nov 18, 2026)
  • 1xxx Lowerline St New Orleans LA 70118 — Wiring for new construction with a new service (New Orleans, LA, Nov 18, 2026)
  • 7xx SLIGO CREEK PKWY TAKOMA PARK 20912 — This project involves modification of the a Previously Approved Building Permit number 935448, wh... (Montgomery County, MD, Nov 18, 2026)
  • 8xxx SECOND AVE SILVER SPRING — Customer Wants To Use ePlans,demo existing wood deck and stair to grade. Construct new screened p... (Montgomery County, MD, Nov 18, 2026)
  • 8xxx HAMPDEN LN BETHESDA 20817 — Please do not request inspections under this permit until 2 business days after permit issuance.W... (Montgomery County, MD, Nov 18, 2026)

Applications vs issued, for new construction

Count the pipeline and new construction shows 2,402 applications still moving: 420 at filed, 1,129 at in review, 384 at corrections or more information, 469 at approved, awaiting issue — all in markets that publish application data.

Of the 1,427 new construction permits with both a filing and an issue date on record, the median wait between the two is 60 days — how far ahead of issuance the application feed sees this lane.

In this lane the pipeline bunches at 'in review / plan check' — 1,129 of the 2,402 unissued new construction applications sit there — so that is the stage to watch for new construction timing. The practical split: applications tell GCs where to aim next; issued permits tell everyone else where the spending just started.

How pros use this feed

Everyone reads new construction, but at different stages. GCs and developers live in the application pipeline, where projects are still winnable. Subs, suppliers, and lenders read issuance, when the project is real and buying starts. The biggest-projects lists in this blog are drawn from this lane more than any other — and PermitBoards' first paying customer was a California builder who bought a Los Angeles new-construction report.

Permit types filed as new construction

  • Residential New Construction Permit — 233
  • Plumbing Permit — 204
  • Building Permit — 189
  • Electrical Permit — 178
  • Building — 140

The fastest way to judge the lane is to read it: open the Austin, TX new construction page, search the free permit lookup, or pull a one-off 30-day report for the county and lane.

Frequently asked questions

What does a new construction permit record show?
What the city prints: the address, what the job is, when it was filed and when it issued, plus the published value and the owner or contractor named, in the markets that release them. In this lane the most common record type is 'Residential New Construction Permit' (233 in the latest windows).

How many new construction permits were issued recently?
The latest count is 3,009 new construction permits issued across 35 live markets in 30-day windows, with Austin, TX out front.

Is the application or the issued permit the better signal for new construction work?
For new construction specifically: 2,402 applications in this lane are filed but unissued right now — the winnable list — while the new construction issued in the latest windows name work already cleared and buying. GCs work the first list; subs and suppliers work the second.

How do I get new construction permits for one county every day?
Subscribe to one county and this lane and the day's new construction permits arrive by email each morning, with a CSV of the day's records attached; filings still in review ride along in markets that publish them. Scale check: Austin, TX issued 793 new construction permits in its latest 30-day window.

Check the actual permits before you pay — free lookup

Search 158,405 issued permits across 46 live markets by ZIP code or city: real addresses, job descriptions and published job values from the same live feed subscribers get every morning. No signup, no card.

Run a free permit lookup See a sample daily alert

Get permits like these for your trade, every morning

Start the paid plan when you're ready — $29 a month for one county — every trade in it — month-to-month, no sales call. Or start with a free 14-day sample feed: the real daily email, built from live permit records. If it doesn't show you work worth chasing, don't pay for it.

Start the paid plan — $29/mo Free 14-day sample See a sample alert first