Minneapolis permit market report — November 2026
Start a free 14-day sample feed for your county
Minneapolis, MN issued 3,070 building permits in its latest 30-day window. Every figure in this report is counted from the jurisdiction's own published records in the PermitBoards database (Oct 8, 2026 to Nov 6, 2026) — no estimates anywhere. The busiest trade lane was plumbing; the feed's status and freshest dates are on the Minneapolis, MN coverage page.
The five busiest trade lanes
| Trade lane | Permits in window |
|---|---|
| Plumbing | 1,499 |
| HVAC | 852 |
| Other / general | 423 |
| Roofing | 294 |
| Remodel & addition | 202 |
| All other lanes combined | 52 |
A permit can count toward more than one trade lane when the work spans trades, so lane counts add up to more than the permit total. Minneapolis, MN's window spans x ZIP codes.
Published job values
1,122 of the 3,070 permits publish a job value — $71,326,767 of published work in total, with a median valued permit of $10,926. The largest single job in each of the three busiest lanes:
| Trade lane | Address | Published value |
|---|---|---|
| Plumbing | 9x 7TH ST S | $5,000,000 |
| HVAC | 9x 7TH ST S | $5,000,000 |
Month over month: the lanes that moved
Plumbing 1,499 (x last window, + 1,499); HVAC 852 (x last window, + 852); Other / general 423 (x last window, + 423).
Who is filing in Minneapolis this month
| Filer (as published) | Permits in window |
|---|---|
| CenterPoint Energy Resource Corp | 604 |
| Warners Stellian Co Inc | 103 |
| Standard Heating and Air Conditioning Inc | 69 |
Five of the newest plumbing permits
- 3xxx LINCOLN ST NE — New sunroom addition Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED... (Nov 6, 2026)
- 4xxx 33RD AVE S — Main floor kitchen and flex room addition. (MAA) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 S... (Nov 6, 2026)
- 2xxx BENJAMIN ST NE — BATHROOM REMODEL (MAA) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIR... (Nov 6, 2026)
- 5xxx UPTON AVE S — INSTALL BASEMENT EGRESS WINDOW Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS AR... (Nov 6, 2026)
- 1xx 3RD AVE S #1205 — Replace dishwasher Unit 1205 (Nov 6, 2026)
Subscribers in Minneapolis, MN see each of these the morning after it posts, filtered to their trade. Lane pages from this market: Minneapolis plumbing permits · Minneapolis hvac permits The one-off Minneapolis, MN report (last 30 days, $29) carries the whole window as PDF + CSV — 1,122 of its permits carry published values, $71,326,767 in all.
Frequently asked questions
How many building permits did Minneapolis, MN issue in its latest 30-day window?
3,070 permits, Oct 8, 2026 to Nov 6, 2026, counted from the jurisdiction's own published records. The busiest trade lane was plumbing.
What is the biggest permitted job in Minneapolis right now?
The largest by published value is $9,462,143 at 8xx 28TH ST E (remodeling corridors on floors 1, 2, and 3. certificate of occupancy required...).
How do I get Minneapolis permits for my trade every day?
One PermitBoards County seat covers every trade in the county. In Minneapolis, MN this window the busiest lane is plumbing with 1,499 permits; a seat for it delivers a daily email with every matching permit and a CSV of the day's permits attached. The one-off Minneapolis, MN report carries the last 30 days for a single lane as PDF + CSV.
Who files the most permits in Minneapolis?
CenterPoint Energy Resource Corp — 604 permits in this window, counted from the filer names Minneapolis, MN publishes on its own records.