Miami new construction permits in November 2026 — the timing picture
Start a free 14-day sample feed for your county
709 new construction permits issued in Miami, FL in the 30 days Oct 21, 2026 to Nov 19, 2026 — 27% of the market's 2,630. Every figure in this post is counted from Miami, FL's own published records in the PermitBoards database; nothing is estimated.
What the count means for new construction crews
Read new-construction issuance as the market's committed future. New construction permits rose 5% in Miami, FL: 709 this window against 677 in the prior 30 days. Values here dwarf every other lane, review takes longest, and the applicant names on the filings are the developers and builders shaping the market's next two years.
New construction permits rose 5% in Miami, FL: 709 this window against 677 in the prior 30 days. The median published value on this lane's permits is $15,000.
Who is pulling Miami's new construction permits
| Filer (as published) | New construction permits in window |
|---|---|
| PRECISION PORTABLES LLC/dba COASTAL WASTE & RECYCLING INC | 11 |
| AYAN ELECTRICAL SERVICES INC | 10 |
| ADMER CONSTRUCTION GROUP LLC | 9 |
Inside the window, new construction issuance in Miami, FL peaked in the first week: the weekly counts ran 194, 157, 174, 130, 54. The newest of them are listed below.
This lane in Miami, by the numbers
| Lane rank in Miami, FL | #2 of 7 |
| Distinct named filers on this lane | 415 |
| Top filer's share of the lane | 2% |
| Total published value on this lane | $429,101,468 |
New construction is 27% of everything Miami, FL issued in the window. In the market's lane table, only remodel & addition (1,107) ran hotter in Miami, FL this window and roofing (167) sits just behind.
The biggest new construction jobs by published value
| Address | Filed | Published value |
|---|---|---|
| 1xxx NE 4 AV | Nov 19, 2026 | $150,000,000 |
| 1xx SW 9 ST | Oct 26, 2026 | $150,000,000 |
| 2xxx TIGERTAIL AV | Oct 29, 2026 | $12,000,000 |
| 5x NE 3 ST | Nov 19, 2026 | $10,000,000 |
| 5x NE 29 ST | Oct 29, 2026 | $7,642,500 |
Five of the newest new construction permits
- 1xxx SW 5 ST — NEW CONSTRUCTION (Nov 19, 2026)
- 5xx N MIAMI AV — NEW CONSTRUCTION (Nov 19, 2026)
- x SW SOUTH RIVER DR — NEW CONSTRUCTION (Nov 19, 2026)
- 4xx NW 42 AV — NEW CONSTRUCTION (Nov 19, 2026)
- 1xxx NW 62 TER — NEW CONSTRUCTION (Nov 19, 2026)
New construction contractors subscribed in Miami, FL — 709 new construction permits this window — get this lane, and only this lane, every morning, and the next filing by PRECISION PORTABLES LLC/dba COASTAL WASTE & RECYCLING INC in the morning digest after the city publishes it. See the Miami new construction permit page or the Miami, FL coverage page.
Frequently asked questions
How many new construction permits did Miami, FL issue in the latest 30-day window?
709 new construction permits, counted from Miami, FL's own published records for Oct 21, 2026 to Nov 19, 2026.
When does a new construction permit become a job lead in Miami?
A new-construction filing is a project whose trades are almost all still open — the longest-lead signal in the feed. In Miami, FL this window, that is 709 issued new construction permits. Issuance converts it into a phased buying schedule that runs for quarters. The lane's most active filer here is PRECISION PORTABLES LLC/dba COASTAL WASTE & RECYCLING INC with 11. GCs watch the filings to bid; everyone else watches issuance to time their phase.
How long do new construction permits take to issue in Miami?
Across the 31 new construction permits in our records that carry both a filing and an issue date, the median time from filing to issue is 64 days.
Is new construction work rising or falling in Miami?
New construction permits rose 5% in Miami, FL: 709 this window against 677 in the prior 30 days. (2,630 permits across the whole market this window, against 2,776 in the prior 30 days.)
Who is filing the most new construction permits in Miami?
PRECISION PORTABLES LLC/dba COASTAL WASTE & RECYCLING INC leads the named filers on this lane's records in the window with 11 permits, counted from the records themselves.