How US building permits work — a plain-English explainer for owners anywhere
Start a free 14-day sample feed for your county
There is no national building permit in the United States. Permits are issued by thousands of cities and counties, each with its own application forms, review process, and timelines — and each one publishes its records its own way. PermitBoards currently tracks 85,801 issued permits across 31 live markets in one database, because collecting that picture market by market is the work nobody overseas — or in the next state — has time to do by hand.
The life of a US permit
A project starts as an application: the owner or their contractor files plans and a description of the work and pays a fee. Reviewers check it against local building, zoning, and safety codes — the in review stage. Many applications come back with corrections to fix. When the city is satisfied, the application is approved, and the permit is issued: work may legally begin. In the 18 markets that publish application data, PermitBoards tracks 23,957 filings moving through those stages right now, in addition to issued permits.
What a permit record contains
The property address. A description of the work. The dates it was filed and issued. And, where the jurisdiction publishes them, the declared job value and the owner or contractor named on the record — printed exactly as the city releases them. That is the whole record, and it is enough to answer the questions an owner [name]: what is being built near my projects, who is building it, and when did it start moving.
Why owners outside the US watch them
A permit is the earliest Name not published public sign that money is about to be spent on US construction. If you own a US construction company from abroad, the filings in your counties tell you what your crews will bid on next month and what your competitors won this week — before any of it reaches a job board or a news story.
Frequently asked questions
Who issues building permits in the US?
Cities and counties — thousands of local jurisdictions, each with its own rules, forms, and timelines. There is no single national permit office, which is why permit data is fragmented and why a multi-market feed exists.
Are US building permits public records?
Yes. Permit applications and issued permits are public records in the jurisdictions PermitBoards covers, including the address, the work described, the dates, and — where the city publishes them — job values and the names on the record.
What is the difference between a permit application and an issued permit?
An application is a project asking for approval; it moves through review stages and may be corrected or denied. An issued permit is approved work that may legally start. Applications are the earlier signal; issued permits are the certain one.