Detroit permit applications: what's in the pipeline — November 2026
Start a free 14-day sample feed for your county
Detroit, MI currently has 142 building-permit applications that are filed but not yet issued, counted over the filings window Oct 18, 2026 to Nov 16, 2026 from the city's own published application records. The largest single group, 141 filings, sits at 'In review / plan check'.
The pipeline by stage
| Stage | Applications | Share | Newest filing at this stage |
|---|---|---|---|
| In review / plan check | 141 | 99% | 1xxx ELIJAH MCCOY 48202 (Nov 16, 2026) |
| Approved, awaiting issue | 1 | 1% | 1xxxx Mack Ave 48224 (Oct 21, 2026) |
Most of Detroit's pipeline is mid-flight: 141 filings (99% of 142) are in review or plan check right now, neither freshly filed nor close to issuance. For trades that sell to builders rather than owners, this is the working window — the projects are real, the plans are drawn, and the sub roster is typically filled while review runs, not after the permit prints.
How Detroit's pipeline is moving
Applications filed rose 522% in Detroit, MI: 143 this window against 23 in the prior 30 days. Week by week inside the window, filings ran 55 in the first stretch, then 22, 46, and 20 in the most recent days.
The trade mix in Detroit's pipeline
| Trade | Applications | Share |
|---|---|---|
| Other / general | 93 | 65% |
| Remodel & addition | 21 | 15% |
| Roofing | 13 | 9% |
| Plumbing | 9 | 6% |
| New construction | 7 | 5% |
Remodel & addition is the largest classified trade in the pipeline with 21 filings (15% of all 142). Within that lane, the filings bunch at 'In review / plan check': 21 of the 21 are there, so remodel & addition crews watching Detroit are mostly looking at city reviewers are checking the plans against code. The next lane is roofing with 13 filings.
The filings cluster in ZIP codes 48226 (14), 48214 (13), 48210 (9) — the rest spread across 61 ZIP codes in the published addresses.
Newest filings on the board
- 1xxx ELIJAH MCCOY 48202 — Install bollards around existing emergency generator. Bollards are 6 in Schedule 40 steel filled with concrete, set 4... (In review / plan check; Nov 16, 2026)
- 1xxxx CORAM 48205 — - 45ft of wall replacement - Install 110ft interior drainage system w/sump pump - Install Six (6) I-Beams (In review / plan check; Nov 16, 2026)
- 4xxx Name not published 48201 — Complete Interior Renovation AKA 9TH FLOOR SUITE 917 (In review / plan check; Nov 16, 2026)
- 6xxx Lakeview St 48213 — THE PROPOSED PROJECT INCLUDES MODIFYING GROUND BASED AND TOWER MOUNTED EQUIPMENT AS INDICATED PER BELOW: REMOVE (4) A... (In review / plan check; Nov 13, 2026)
- 3xx Ashland St 48215 — TEAR OFF EXISTING ROOF TO DECKING AND SHINGLES. INSTALL NEW UNDERLAYMENT PER CODE, INSTALL NEW FLASHING , DRIP EDGE ,... (In review / plan check; Nov 13, 2026)
- 2xxxx Joy Rd 48228 — Installation of cook line and hood with makeup air in an existing retail (gas station store). Work will consist of el... (In review / plan check; Nov 13, 2026)
Subscribers in Detroit, MI see new filings every morning with their stage, next to the issued permits for their trade — applications are included in the same county + trade seat, never a separate charge. For Detroit, MI right now that means watching 142 live filings, 141 of them at 'In review / plan check'. The market's full picture is on the Detroit, MI coverage page and the applications hub.
Frequently asked questions
How many unissued permit applications does Detroit, MI have?
142 applications were filed but not yet issued in the latest filings window (Oct 18, 2026 to Nov 16, 2026).
Which stage holds the most Detroit applications?
'In review / plan check' — 141 of the 142 filings (99%), meaning city reviewers are checking the plans against code.
What trades are filing the most applications in Detroit?
Remodel & addition leads the classified trades with 21 filings, followed by roofing (13) and plumbing (9).
Is Detroit's permit pipeline growing or shrinking?
Applications filed rose 522% in Detroit, MI: 143 this window against 23 in the prior 30 days. That counts every application filed in each window, issued since or still in process.
Does Detroit publish applicant [name] on applications?
x% of the 142 filings in this window carry a phone number as published on the record (x of them). PermitBoards passes published fields through exactly as released and never appends bought contact data.