Cambridge electrical permits in November 2026 — the timing picture
Start a free 14-day sample feed for your county
199 electrical permits issued in Cambridge, MA in the 30 days Oct 22, 2026 to Nov 20, 2026 — 24% of the market's 842. Every figure in this post is counted from Cambridge, MA's own published records in the PermitBoards database; nothing is estimated.
What the count means for electrical crews
This lane counts both standalone electrical jobs and the electrical scope of bigger projects, which is why its movement leads the market's. Electrical permits fell 2% in Cambridge, MA: 199 this window against 203 in the prior 30 days. The filings below show the same demand a few weeks earlier, while crews are still being assembled.
Electrical permits fell 2% in Cambridge, MA: 199 this window against 203 in the prior 30 days. The median published value on this lane's permits is $8,683.
The lane's work clusters in ZIP codes 02138 (70), 02139 (47), 02142 (45) — the rest spreads across 5 ZIP codes in the published addresses.
Inside the window, electrical issuance in Cambridge, MA peaked in the fourth week: the weekly counts ran 44, 50, 24, 81, 0. The newest of them are listed below.
This lane in Cambridge, by the numbers
| Lane rank in Cambridge, MA | #2 of 9 |
| Distinct named filers on this lane | 144 |
| Total published value on this lane | $9,849,429 |
Electrical is 24% of everything Cambridge, MA issued in the window. In the market's lane table, only plumbing (241) ran hotter in Cambridge, MA this window and remodel & addition (113) sits just behind.
The biggest electrical jobs by published value
| Address | Filed | Published value |
|---|---|---|
| 7x Broadway, Cambridge, MA 02142 | Nov 13, 2026 | $2,300,000 |
| x One Kendall Square Complex, Unit 300, Cambridge, MA 02142 | Oct 22, 2026 | $899,505 |
| 3xx Binney St, Cambridge, MA 02142 | Nov 13, 2026 | $700,000 |
| 2xx Massachusetts Ave, Cambridge, MA 02139 | Nov 2, 2026 | $695,000 |
| 6x Columbia, Cambridge, MA 02139 | Oct 22, 2026 | $381,400 |
Five of the newest electrical permits
- 1xx Hampshire St, Cambridge, MA 02141 — Non-illuminated wall sign for SpinFresh Laundry at 1xx Hampshire St, Cambridge, MA 02139. Installation of formed plastic dimens... (Nov 18, 2026)
- 3x PRINCE ST, Unit 39/1, Cambridge, MA 02139 — Furnace and A/C replacement (Nov 18, 2026)
- 4x-x Cogswell Ave, Cambridge, MA 02140 — Replacement of high efficiency gas furnace (Nov 18, 2026)
- 5xx Kendall St, Cambridge, MA 02142 — Level 01 medical clinic fit-out at 5xx Kendall St: electrical demo and make safe, temp lighting and power, new 75 kVA transform... (Nov 18, 2026)
- 1xx Harvard St, Cambridge, MA 02139 — Street Lights swapped out and Electric Vehicle Charging Stations installed with Control Cabinet in Green Rose Heritage Park ref... (Nov 18, 2026)
Electrical contractors subscribed in Cambridge, MA — 199 electrical permits this window — get this lane, and only this lane, every morning. See the Cambridge electrical permit page or the Cambridge, MA coverage page.
Frequently asked questions
How many electrical permits did Cambridge, MA issue in the latest 30-day window?
199 electrical permits, counted from Cambridge, MA's own published records for Oct 22, 2026 to Nov 20, 2026.
When does a electrical permit become a job lead in Cambridge?
An issued electrical permit usually sits inside a bigger job whose GC is already buying — wire, panels, fixtures, inspection slots. In Cambridge, MA this window, that is 199 issued electrical permits. For electrical subs the filing is the lead: a project in review has not set its electrical crew. The median published value on this lane's permits here is $8,683. For suppliers, issuance is the demand signal that times the counter sale.
How long do electrical permits take to issue in Cambridge?
Across the 2,677 electrical permits in our records that carry both a filing and an issue date, the median time from filing to issue is 7 days.
Is electrical work rising or falling in Cambridge?
Electrical permits fell 2% in Cambridge, MA: 199 this window against 203 in the prior 30 days. (842 permits across the whole market this window, against 805 in the prior 30 days.)